Skip to main navigation Skip to search Skip to main content

Delay Analysis of TSN Based Industrial Networks With Preemptive Traffic Using Network Calculus

Research output: Chapter in Book/Report/Conference proceedingsConference proceedingpeer-review

Abstract

Time-Sensitive Networking (TSN) extends traditional Ethernet to support data traffic with ultra-reliability and time-critical requirements for a range of applications in industrial automation, automotive, and aerospace. The TSN standards present guidelines to integrate different types of data traffic over a single converged network. Therefore, it is becoming an enabling technology towards the Industry 4.0 vision of integrating information and operational technologies within future Industrial Internet of Things networks. In this paper, we develop a network calculus based framework to analyse TSN based industrial networks supporting a range of data traffic classes. We apply the framework to study and analyse a well-known industrial use case, Quality Checks After Production (QCAP), with four data traffic types with different requirements in terms of reliability and end-to-end latency. In our evaluation, we validate our framework with a computer simulation model and compare the tightness of the calculated delay bounds to a state-of-the-art approach. We then use our model to analyse the upper bounds on the worst-case delay of the different QCAP traffic types and assess the factors that impact end-to-end delay, e.g. flow offset and critical links. Finally, we compare various credit accumulation rates and their impact on the traffic delay bounds.

Original languageEnglish
Title of host publication2023 IFIP Networking Conference, IFIP Networking 2023
PublisherInstitute of Electrical and Electronics Engineers Inc.
ISBN (Electronic)9783903176577
DOIs
Publication statusPublished - 2023
Event22nd International Federation for Information Processing Conference on Networking, IFIP Networking 2023 - Barcelona, Spain
Duration: 12 Jun 202315 Jun 2023

Publication series

Name2023 IFIP Networking Conference, IFIP Networking 2023

Conference

Conference22nd International Federation for Information Processing Conference on Networking, IFIP Networking 2023
Country/TerritorySpain
CityBarcelona
Period12/06/2315/06/23

UN SDGs

This output contributes to the following UN Sustainable Development Goals (SDGs)

  1. SDG 9 - Industry, Innovation, and Infrastructure
    SDG 9 Industry, Innovation, and Infrastructure

Keywords

  • Deterministic Latency
  • IIoT
  • Industrial networks
  • Network Calculus (NC)
  • Quality control
  • Time-Sensitive Networking (TSN)

Fingerprint

Dive into the research topics of 'Delay Analysis of TSN Based Industrial Networks With Preemptive Traffic Using Network Calculus'. Together they form a unique fingerprint.

Cite this