Gap analysis of current best practices in the area of continual commissioning

Research output: Chapter in Book/Report/Conference proceedingsChapterpeer-review

Abstract

This paper analyses the status of Continual Commissioning (subsequently short-named as CC) aiming to improve the energy efficient design and operation of built artefacts. In order to develop a comprehensive vision of the CC market worldwide it is compulsory to establish a state-of-the-art analysis based on already existing Best Practices (BP). As a result of these identified challenges, commonalities, deficits, and potentials for collaboration are identified contributing to enhance harmonization between the CC-related technology developers. This paper proposes a systematic categorization approach to identify gaps in the current Best Practices in the area of Continual Commissioning. More than 500 companies and organizations related to this area have been analyzed, 100 of them have been selected for further categorization and analysis. The proposed method allows to identify major deficits of the related services offered within the specified categories. Finally, areas in CC which require substantial improvement are identified.

Original languageEnglish
Title of host publicationeWork and eBusiness in Architecture, Engineering and Construction - Proceedings of the 10th European Conference on Product and Process Modelling, ECPPM 2014
PublisherCRC Press/Balkema
Pages695-700
Number of pages6
ISBN (Print)9781138027107
DOIs
Publication statusPublished - 2015
Event10th European Conference on Product and Process Modelling, ECPPM 2014 - Vienna, Austria
Duration: 17 Sep 201419 Sep 2014

Publication series

NameeWork and eBusiness in Architecture, Engineering and Construction - Proceedings of the 10th European Conference on Product and Process Modelling, ECPPM 2014

Conference

Conference10th European Conference on Product and Process Modelling, ECPPM 2014
Country/TerritoryAustria
CityVienna
Period17/09/1419/09/14

Fingerprint

Dive into the research topics of 'Gap analysis of current best practices in the area of continual commissioning'. Together they form a unique fingerprint.

Cite this