Optimizing power-to-H2 participation in the Nord Pool electricity market: Effects of different bidding strategies on plant operation

  • Leandro Janke
  • , Shane McDonagh
  • , Sören Weinrich
  • , Jerry Murphy
  • , Daniel Nilsson
  • , Per Anders Hansson
  • , Åke Nordberg

Research output: Contribution to journalArticlepeer-review

Abstract

The operation of power-to-X systems requires measures to control the cost and sustainability of electricity purchased from spot markets. This study investigated different bidding strategies for the day-ahead market with a special focus on Sweden. A price independent order (PIO) strategy was developed assisted by forecasting electricity prices with an artificial neural network. For comparison, a price dependent order (PDO) with fixed bid price was used. The bidding strategies were used to simulate H2 production with both alkaline and proton exchange membrane electrolysers in different years and technological scenarios. Results showed that using PIO to control H2 production helped to avoid the purchase of expensive and carbon intense electricity during peak loads, but it also reduced the total number of operating hours compared to PDO. For this reason, under optimal conditions for both bidding strategies, PDO resulted in an average of 10.9% lower levelised cost of H2, and more attractive cash flows and net present values than PIO. Nevertheless, PIO showed to be a useful strategy to control costs in years with unexpected hourly price behaviour such as 2018. Furthermore, PIO could be successfully demonstrated in a practical case study to fulfil the on-demand requirement of an industrial captive customer.

Original languageEnglish
Pages (from-to)820-836
Number of pages17
JournalRenewable Energy
Volume156
DOIs
Publication statusPublished - Aug 2020

Keywords

  • Bidding strategy
  • Economic indicators
  • Electrolysis
  • Hydrogen production
  • Neural networks
  • Variable renewable electricity

Fingerprint

Dive into the research topics of 'Optimizing power-to-H2 participation in the Nord Pool electricity market: Effects of different bidding strategies on plant operation'. Together they form a unique fingerprint.

Cite this