Wind energy and system security – the grid connection moratorium in Ireland

Research output: Contribution to journalArticlepeer-review

Abstract

This examines the interaction between technical challenges and policy choices that are made regarding wind power, and uses the grid connection moratorium in Ireland as a case study. While total installed wind capacity in Ireland is low compared with Germany, Spain and Denmark, wind power penetration is higher in the Irish system than in either the British, UCTE or NORDEL systems. In December 2003 the system operators expressed concerns about high wind power penetration, in particular the challenges of maintaining power system stability, security and reliability, resulting in a moratorium on new grid connection agreements. Significant progress has since been made in grid codes and dynamic models for wind turbines. In March 2006, there remain almost 3000 MW of proposed wind capacity awaiting a grid connection agreement This paper investigates the technical issues underpinning this moratorium, monitors progress made since its introduction and suggests alternative technical solutions to the moratorium.

Original languageEnglish
Pages (from-to)633-647
Number of pages15
JournalInternational Journal of Energy Technology and Policy
Volume5
Issue number5
DOIs
Publication statusPublished - 2007

UN SDGs

This output contributes to the following UN Sustainable Development Goals (SDGs)

  1. SDG 7 - Affordable and Clean Energy
    SDG 7 Affordable and Clean Energy

Keywords

  • grid connection network
  • operation system security
  • wind power penetration

Fingerprint

Dive into the research topics of 'Wind energy and system security – the grid connection moratorium in Ireland'. Together they form a unique fingerprint.

Cite this